12 artikel untuk “Building Performace” Hapus filter
Ekspor
Mungkin maksud Anda: Building performa
Makna serupa aktif: 5 artikel tambahan ditemukan berdasarkan kemiripan makna, meski tidak memuat kata yang sama. Matikan
ANALISIS PENJADWALAN PROYEK KONSTRUKSI DENGAN SIMULASI MONTE CARLO DAN PDM/PERT
makna serupaAli Akbar1, Abdul Kadir2, Siti Nurjanah Ahmad3
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 3 No. 2 2022 DOI 10.33772/jmr.v3i2.23449
EFEKTIVITAS PELAYANAN DENGAN SISTEM JEMPUT BOLA DALAM PENGURUSAN IZIN MENDIRIKAN BANGUNAN (IMB) PADA DINAS PEKERJAAN UMUM DAN TATA RUANG KABUPATEN KONAWE
ST, Mus Emil
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 1 No. 1 2019 DOI 10.33772/jmr.v1i1.6448
EVALUASI PRODUKTIVITAS DAN OPTIMASI PENGGUNAAN PERALATAN MEKANIS PADA PEKERJAAN CUT AND FILL
makna serupaHendra Kundrad SR, Minson Simatupang, Sudarsono Sudarsono
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 3 No. 2 2022 DOI 10.33772/jmr.v3i2.23448
Pola Penanganan Pemukiman Kumuh Kelurahan Abeli Kota Kendari
Heber Heber, Abdul Kadir, Ishak Kadir
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 4 No. 2 2022 DOI 10.33772/jmr.v4i2.27304
EVALUASI KINERJA PELAYANAN TERMINAL BARUGA DI KOTA KENDARI
Rasmida Rasmida, Abdul Kadir, Adris Ade Putra
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 3 No. 2 2022 DOI 10.33772/jmr.v3i2.23463
ANALISIS PENJADWALAN PROYEK DENGAN METODE PERT (STUDI KASUS PADA PEKERJAAN REHABILITASI JALAN RA. KARTINI KOTA KENDARI)
makna serupaIda Sutianingsih, Siti Nurjanah Ahmad, Nasrul Nasrul
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 5 No. 1 2023 DOI 10.33772/jmr.v5i1.43303
PENERAPAN METODE CRITICAL PATH METHOD (CPM) DAN PRECEDENCE DIAGRAM METHOD (PDM) DALAM RESCHEDULLING PROYEK KONSTRUKSI (Studi Kasus: Kegiatan Peningkatan Jalan Poros Wawonggole – Palarahi)
makna serupaAsman Asman, Edwar Ngii, Adris Ade Putra
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 3 No. 2 2022 DOI 10.33772/jmr.v3i2.23454
DIGITASI KAWASAN PERMUKIMAN KUMUH KECAMATAN ABELI KOTA KENDARI
Fajerullah Akbar Husain, Edward Ngii, Muhammad Thahir Adzikin
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 4 No. 1 2022 DOI 10.33772/jmr.v4i1.27270
EFESIENSI DAN EFEKTIVITAS PENGGUNAAN ALAT BERAT BALAI PELAKSANA JALAN NASIONAL XXI KENDARI PADA PEKERJAAN JALAN NASIONAL DI KONAWE UTARA
Paisal Paisal, Adris Ade Putra, La Ode Muh Magribi
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 4 No. 1 2022 DOI 10.33772/jmr.v4i1.27268
ANALISIS KINERJA DAN KEPUASAN PELAKSANAAN PROGRAM PADAT KARYA MELALUI PENDEKATAN KUANTITATIF PADA PEKERJAAN PEMELIHARAAN JALAN SP3. WAKOKO - LASALIMU - KAMARU
makna serupaUtomo Pranata Hardiansyah, Abdul Kadir, Siti Nurjanah Ahmad, Laode Muh. Nurrakhmad Arsyad
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 5 No. 2 2023 DOI 10.33772/jmr.v5i2.47444
ANALISIS PERSEPSI PENUMPANG TERHADAP TINGKAT PELAYANAN ANGKUTAN PERDESAAN DI KABUPATEN KONAWE KEPULAUAN
M Reza Amri, Abdul Kadir
Jurnal Manajemen Rekayasa (Journal of Engineering Management) Vol. 3 No. 1 2021 DOI 10.33772/jmr.v3i1.18204