KETERKAITAN ANTARA BIM 4D DAN PENGENDALIAN WAKTU PELAKSANAAN PADA PEMBANGUNAN PERUMAHAN (Studi Kasus: Perumahan Alya Residence) Reza Prasetyo, Andri Andri, Muhammad Sadam, Priskhal Priskhal, Ridwansyah Nuhun, Try Sugiyarto Soeparyanto, Lawelendo Lawelendo STABILITA || Jurnal Ilmiah Teknik Sipil Vol. 12 No. 2 2024 DOI 10.55679/jts.v12i2.48026